What are the proced那分ures for restauran雪民t decoration engineering

Author:


Material budget and cost allocatio為這n: Currently, people p又體rioritize comfor要村t, and the reasonable proportion of新個 material costs is: 45% for bathro相西oms and cabinets, 35% for hall懂離s, and 20% for bedrooms.

Material budget and cost al家讀location: Currently, people prioriti光遠ze comfort, and th舊計e reasonable proportion of material 輛銀costs is: 45% for bathrooms and c年書abinets, 35% for halls, a煙微nd 20% for bedr開海ooms.
1. Wall paint (pack就黃age material Dulux Gold 5-in-1) 16/sq懂農uare meter
2. Gypsum board ceili信土ng (Dragon brand) 95/square m知鐵eter
3. Aluminum buckle plate (Jack light s熱跳teel keel) 90/square北匠 meter
4. Gypsum internal co市技rner line (Guangzhou Jianj睡朋un) 8/m
5. TV background師讀 wall 880
6. Door (Junjian special grade l子腦arge core board, spr業弟ayed with Weibai pai見件nt) 600/piece
7. Door cover (Junjian special g通慢rade large core board, sprayed 信為with Weibai paint) 60/m
8. Window cover (Junjian special 北費grade large core board, sprayed員月 with Weibai paint) 80/m
9. Plastic steel door子票 (Fengying) 400/piece
10. Window sill校校 artificial stone surface (2 meters器就 * 0.7 meters) 700/piec微來e
11. Sliding door (Jun去筆jian special grade lar暗草ge core board, sprayed with W雜要eibai paint) 600/piece
12. Wardrobe (1.8m些討 * 2.6m imported melami山中ne board) 2000/piece
14. Cabinet (4.5m imported mel吃亮amine board artificial stone counterto音錢p) 3000
15. Sliding window (2 meters * 你下2.2 meters Junjian special grade larg都刀e core board, sprayed w錯匠ith Weibai paint) 1000/piece
16. Masonry (floor tiles: 林讀800 * 800, 48 square me雨音ters, 10/square meters)笑弟
600 * 600 15 square meters 6/sq商房uare meter
Cabinet and bathroom wall tiles: 55 人如square meters 9/square 很數meters
Floor tiles: 20 square meters 6/squ要爸are meter
Ground leveling 42 square meter妹和s 4/square meter
6 door stones 10/pie我票ce
3 tons of cement and 5 cubic麗店 meters of sand
Total: 3300 yuan
17. Water and electricity renovation: 8們分00 (excluding materi和文als)

Knowledge of glass inst坐理allation constructio師線n

Before installing the glass, the di長道rt inside the groove不飛 should be removed thoroughly, and a 1上相~3mm thick bottom ash should be ev家對enly applied along the entire l大靜ength of the groove, and the通看 flat glass should be車去 pushed until oil spills.

2023-01-03

Installation process standards媽要 for switches and sockets

All types of switche書大s: The specification相山s and models mus服東t meet the design require術空ments and have a product qualificati可做on certificate. All types 學車of sockets, specificatio民商ns and models must meet the desi你跳gn requirements and have a pr員玩oduct qualificati外聽on certificate.